Beach Hotel Map – Build History (7/7)

And here we have the last phase of the build process. Here are two more houses, the town gas station, and the final parts of the hotel that get added, marking the end of my contribution to this map!

Giving The VIPs A Win

By early 2023, the only floor type with a gap in its construction was the Mega Hotel Suite type, so it was time to finish. The two spots dedicated to the VIP Mega Hotel Suite room type were finally filled with as many features as I could think of.

  • Building the balcony layout of upper floor.

Final Town Work

Remember the empty space between the southern stretch of road C3 and the hotel grounds that got a house recently? It finally gets filled in with three new houses, two of which are together, forming another townhouse.

  • Clearing the spot for the Sunset Delight house.

The last part of the town built by me is the gas station and its corner store. Seen as a relatively simple yet essential addition, it was a no-brainer.

  • Early layout design of gas station lot.

Finalizing With The Hotel

The final stretch of my contribution to this map was in the hotel, as the end goal was to at least finish the entire hotel area, including the building itself and the lands owned by it.

We first started with the basics of the lower floor of the Part 1 side of the Upper Leisure floors, with the Bowling Arena and Lido Game Room.

  • Work moving back to upper floors of hotel building.

Next up was the middle floor of the same area. The base of the Lido Pool Area and areas around it were fully built, laying the foundation for the floor above.

  • Started off with building the public restrooms and north entrance of base floor.

Next up were the final touches of the top of the building. The Lido Pool Overlying Balcony and Rooftop Terraces were built, being part of the last areas built.

  • Adding more tall decor.

The part of the building also built last with the Rooftop Terraces was the Lido Dining Area, built in the beginning of 2024. The unique vibe was a great way to finalize the build process.

  • Building center hallway of dining area.

Final Final Touches

The final work for the map involved tweaking the hanging lamps in the hotel and minor tweaks in the Hotel Lounge building.

  • Polishing the hanging lamp.

You’ve made it to the end of this page, and therefore the end of the entire build history! Click here to go back, to page 6.

Last updated on December 19, 2024.